Bubanj Potok / Construction of a toll station on the Belgrade-Nis highway with associated roads, Vrcin

Executed works:

  • RC works
  • Gross area 27 581 m2
  • Prefabrication of 2433 RC piles
  • Accompanying and auxiliary works

Construction of new Residential building

  • Two towers each 24 floors (90m high)
  • Two underground floors
  • Ground floor (commercial)
  • GFA 75 000m2

Executed Works:

  • Preparatory works
  • Earthworks
  • RC works
  • Plastering works
  • Screeds
  • Gypsum works / painting works
  • Ceramic works
  • Facade works
  • Locksmith works
  • Bathrooms and terraces
  • Construction site logistic

Residential building

  • Two towers each 24 floors (90m high)
  • Two underground floors
  • Ground floor (commercial)
  • GFA 77 000m2

Ongoing Works

  • RC works in situ
  • Masonry works
  • Finishing works
  • Façade works
  • Penetron system insulation

Business commercial building in the block Nr.43-New Belgrade

  • 2 underground floors + ground floor + 8 floors
  • GFA 28000 m2

Executed works:

  • RC works / painting works
  • Locksmith works
  • Roads / Exterior design
  • Site logistic (procurement of materials and cleaning)

Business commercial building in the block Nr.43-New Belgrade

  • 2 underground floors + ground floor + 8 floors
  • 12500 m2
  • Garage G2 6000m2

Executed works:

  • RC works / painting works
  • Locksmith works
  • Roads / Exterior design
  • Site logistic (procurement of materials and cleaning)

Hotel and business center

  • Surface of underground floors is 7500m2
  • Total gross floor area of the complex is 65000m2

Executed works:

  • RC works
  • Ceramic works
  • Plaster works
  • Electrical works
  • Air-conditioning works
  • Painting works
  • Carpentry-locksmith works
  • Upholstery works

Hotel, Building UP1-5B / Building UP1-14

Executed works:

  • RC works
  • Masonry works
  • Hydro insulation works
  • Thermo insulation works
  • Cement screed
  • Plaster works
  • Painting works
  • Upholstery works
  • Drywall works
  • Contact facade
  • Exterior design

Kragujevac, Serbia

  • RC works in situ
  • Masonry works
  • Plastering works
  • Painting works
  • Façade works

Halls for production of memory foam in Ruma, Serbia

Construction of production complex in Ruma was realized in period from 01.10.2014. to 30.07.2015. Project was contracted on a turnkey basis, with all associated installations and exterior design of the complex.

 

Complex consists of 4 buildings with fallowing areas:

  • Building 2 – 5250 m2

  • Building 3 – 8250 m2

  • Building 4 – 8250 m2

  • Building 5 – 7250 m2

The total area under buildings is 29.000 m2

Surface of associated roads is 17.000 m2

LIDL SERBIA

Executed Works

  • RC works in situ
  • Painting works
  • Facade works
  • Gypsum works
  • Aluminum works

Extension and reconstruction of the building

Executed works:

  • Steel construction
  • Ceramic works
  • Plaster works
  • Cement screed
  • Facing brick facade
  • Painting works
  • Upholstery works
  • Drywall works
  • Contact facade
  • Exterior design

Residential and commercial building, Uralska 3, Belgrade

  • Execution of reinforced concrete works 18500m2

Construction of buildings for judicial authority in city of Kragujuevac

Executed works:

  • Preparatory works
  • Earthworks
  • RC works
  • Plaster works screeds
  • Gypsum works
  • Painting works
  • Ceramic works

Residental and commercial buildings 

Construction and crafts works according to “turnkey “system:

  • 4E section 1 P=4.400,00 m2
  • 2E section 4 P=4.200,00 m2
  • 2E section 3 P=3.000,00 m2
  • 3E section 1 P=3.600,00 m2

Petrol station, Kovacica

The fourth largest domestic car supplier.

Ongoing works:

  • RC works in situ
  • Masonry works
  • Plastering works

Pay tolls on highways in Serbia

Vrcin

  • Construction of pay toll on Belgrade-Nis highway. with associated roads

Nis

  • 3 more pay tolls

Obrenovac

  • on IA state road Nr.2 ( E763), at km 24+250 – entry and at km 24+575 – exit

Railway station in city of Smederevo

With associated parts of the railway