Bubanj Potok / Construction of a toll station on the Belgrade-Nis highway with associated roads, Vrcin
Executed works:
- RC works
- Gross area 27 581 m2
- Prefabrication of 2433 RC piles
- Accompanying and auxiliary works
Construction of new Residential building
- Two towers each 24 floors (90m high)
- Two underground floors
- Ground floor (commercial)
- GFA 75 000m2
Executed Works:
- Preparatory works
- Earthworks
- RC works
- Plastering works
- Screeds
- Gypsum works / painting works
- Ceramic works
- Facade works
- Locksmith works
- Bathrooms and terraces
- Construction site logistic
Residential building
- Two towers each 24 floors (90m high)
- Two underground floors
- Ground floor (commercial)
- GFA 77 000m2
Ongoing Works
- RC works in situ
- Masonry works
- Finishing works
- Façade works
- Penetron system insulation
Business commercial building in the block Nr.43-New Belgrade
- 2 underground floors + ground floor + 8 floors
- GFA 28000 m2
Executed works:
- RC works / painting works
- Locksmith works
- Roads / Exterior design
- Site logistic (procurement of materials and cleaning)
Business commercial building in the block Nr.43-New Belgrade
- 2 underground floors + ground floor + 8 floors
- 12500 m2
- Garage G2 6000m2
Executed works:
- RC works / painting works
- Locksmith works
- Roads / Exterior design
- Site logistic (procurement of materials and cleaning)
Hotel and business center
- Surface of underground floors is 7500m2
- Total gross floor area of the complex is 65000m2
Executed works:
- RC works
- Ceramic works
- Plaster works
- Electrical works
- Air-conditioning works
- Painting works
- Carpentry-locksmith works
- Upholstery works
Hotel, Building UP1-5B / Building UP1-14
Executed works:
- RC works
- Masonry works
- Hydro insulation works
- Thermo insulation works
- Cement screed
- Plaster works
- Painting works
- Upholstery works
- Drywall works
- Contact facade
- Exterior design
Kragujevac, Serbia
- RC works in situ
- Masonry works
- Plastering works
- Painting works
- Façade works
Halls for production of memory foam in Ruma, Serbia
Construction of production complex in Ruma was realized in period from 01.10.2014. to 30.07.2015. Project was contracted on a turnkey basis, with all associated installations and exterior design of the complex.
Complex consists of 4 buildings with fallowing areas:
-
Building 2 – 5250 m2
-
Building 3 – 8250 m2
-
Building 4 – 8250 m2
-
Building 5 – 7250 m2
The total area under buildings is 29.000 m2
Surface of associated roads is 17.000 m2
LIDL SERBIA
Executed Works
- RC works in situ
- Painting works
- Facade works
- Gypsum works
- Aluminum works
Extension and reconstruction of the building
Executed works:
- Steel construction
- Ceramic works
- Plaster works
- Cement screed
- Facing brick facade
- Painting works
- Upholstery works
- Drywall works
- Contact facade
- Exterior design
Residential and commercial building, Uralska 3, Belgrade
- Execution of reinforced concrete works 18500m2
Construction of buildings for judicial authority in city of Kragujuevac
Executed works:
- Preparatory works
- Earthworks
- RC works
- Plaster works screeds
- Gypsum works
- Painting works
- Ceramic works
Residental and commercial buildings
Construction and crafts works according to “turnkey “system:
- 4E section 1 P=4.400,00 m2
- 2E section 4 P=4.200,00 m2
- 2E section 3 P=3.000,00 m2
- 3E section 1 P=3.600,00 m2
Petrol station, Kovacica
The fourth largest domestic car supplier.
Ongoing works:
- RC works in situ
- Masonry works
- Plastering works
Pay tolls on highways in Serbia
Vrcin
- Construction of pay toll on Belgrade-Nis highway. with associated roads
Nis
- 3 more pay tolls
Obrenovac
- on IA state road Nr.2 ( E763), at km 24+250 – entry and at km 24+575 – exit
Railway station in city of Smederevo
With associated parts of the railway
Lestane, Serbia